aHR0cDovL2ZyZWVzaGlwLmNvLmty
- ±Ù¿ø: CN (Á¤Ç°)
- ºÐ¹«±â À¯Çü: ÆßÇÁ
- Àç·á: ±Ý¼Ó
- ±Ý¼Ó À¯Çü: STAINLESS STEEL
- À¯Çü: ºÐ¹«±â
PRODUCT SPECIFICATION:
Natural Gas Burner
1. Introduction:
Natural gas burner is widely used in steam boilers, hot water boilers, thermal oil furnaces, coal-fired boilers, hot blast stoves, drying furnaces, kilns, ovens and other boilers that require heat sources.
?
Product Parameter:
(1) Natural Gas Consumption: 2.3-11 (cubic/hour Nm3/h)
Output Power: 23.2-116 (dry watt kW)
Output Heat: 20000-100000 (kcal/h kcal/h)
Power Supply: 220/50 (V/Hz)
Adjustment Method: Single-stage
Motor Power: 180 (W)
Controller: Siemens
Air valve: Dongsi/Honeywell (optional)
Intake Port Size: DN15
(2)Liquefied Gas Consumption: 1.8-9 (kg/h Nm3/h)
Output Power: 23.2-174 (dry watt kW)
Output Heat: 20000-150000 (dry calorie/hour kcal/h)
Power Supply: 220/50 (V/Hz)
Adjustment Method: Single-stage
Motor Power: 180 (W)
Controller: Siemens
Air Valve: Dongsi/Honeywell (optional)
Intake Port Size: DN15
Installation Process:
(1). Install the mounting flange asbestos gasket on the combustion tube, extend the combustion tube into the furnace, and align the screw holes to fix the mounting flange on the furnace body. After confirming the position of the extension into the furnace, lock the screws everywhere. Make sure that the burner is installed firmly. Note that the burner should be installed horizontally or vertically, not inclined.
?
(2). After the burner body is installed, connect the fuel oil inlet and return pipes to the oil inlet and return ports of the oil pump according to the design. It should be noted that a filter should be installed on the oil inlet pipe and the filter should be cleaned regularly. After the connection is completed, check the tightness of the pipeline.
Scope of Application:
Steam, hot water, boiler, cooking stove, spray coating, hot air generator, baking equipment, melting furnace, heating furnace, incinerator, and other industrial furnaces
Technical Operation:
(1) Press the main fire start button on the combustion control panel. After the mother fire work indicator lights up for 10 seconds, confirm that the mother fire is lit. If the main fire indicator light goes out within 10 seconds, the combustion fault alarm buzzer on the combustion control panel will sound, indicating that the ignition has failed; after 60 seconds, manually press the fault reset button of the programmer to restart the main fire button.
(2) After the main fire is ignited normally, the operator confirms whether the main fire is ignited through the observation hole of the burner. After confirming, press the large fire start button on the burner control panel. After a few seconds delay, after the high fire indicator lights up, the operator in front of the furnace should slowly open the load regulating ball valve and increase the combustion air proportionally until the flame appears The main blue plus reddish is best.
(3) After the fire is ignited and stabilized, check whether the gas supply pressure of the main pipeline is within the normal range.
(4) The fan starts and enters the pre-blowing stage. Check that the equipment is in a normal state.
(5) Observe the gas and air pressure instructions, and confirm that the burner operation permission instruction is given.
(6) Press the combustion control button on the combustion control panel, and the combustion controller enters the combustion start program at this time.
(7) The task of firing the open fire has been completed. The operator should turn off the main fire button on the panel in time, cut off the main fire and keep the fire burning.
(8) The operator can adjust the size of the flame (load) at any time according to the process requirements during the burning process of the big fire. When the process requires that the fire be turned off for a short time, the operator should turn on the main fire switch to retain the main fire, and then turn off the high fire switch.
(9) Adjust the gas valve and air valve operating handles, which can be adjusted in stages to ensure that the burner load output meets the process requirements.
(10) Shutdown operation: For temporary shutdown, first turn off the fire, then turn off the combustion control switch, and finally turn off the stop button.
?
Daily Maintenance of the Burner:
1. Daily maintenance and maintenance
(1) Always keep the surfaces clean.
(2) When the equipment is stopped, each rotation of the quick opening blind plate (flange cover) should be lubricated in time according to the regulations. The screw at the opening and closing parts should be coated with lubricating grease. Other parts should also be coated with lubricating grease. The lubricating grease part can be filled with 10# or 20# oil.
2. Maintenance and maintenance during operation
(1) It is recommended that the operator be responsible for the usual maintenance of the equipment.
(2) Always keep the equipment surface clean.
(3) Monitor the reading of the differential pressure gauge at any time. When the pressure difference reaches 0.O2Mpa, the filter element should be flushed.
?
Inspection cycle:
(1) The periodic inspection of this equipment must be carried out in strict accordance with the relevant regulations in Chapter 6 of the "Capacity Regulations".
(2) Carry out a comprehensive inspection of the equipment at least once a year, and measure the wall thickness of the equipment, and conduct a non-destructive test on the pressure welds of the equipment every two years. All inspection and test results should be recorded in the technical file of the equipment.
(3) When there is pressure inside the equipment, no maintenance is allowed. For maintenance under special circumstances, it must be carried out in strict compliance with the provisions of Article 122 of the "Rong".
?
Maintenance when parking:
(1) When the equipment is parked, the liquid in the equipment should be drained.
(2) Close all valves.
(3) Thoroughly clean the surface of the equipment.
(4) All rotating parts are coated with anti-grease.
(5) Cover all the devices with canvas to prevent dust and dirt from depositing on the surface of the equipment.
Payment:
-We accept the following payment methods:
-Credit Card, VISA, Bank to Bank Wire Transfers, PayPal, Western Union and so on.?
-All payments made on AliExpress are processed by Alipay and PayPal.
Shipping:
-Please pay more attention to your order address which MUST MATCH your shipping address.?
-Shipping will be worldwide via: e-Packet?/?China post air mail /?CDEK?/?ARAMEX /?EMS?/?UPS?/?FEDEX?/?DHL?/?TNT.
-Remote area may cause extra shipping fee.
-Please check items when delivered, if damaged, please kindly accept it and contact us immediately. We will make a confirmation and resend you a new one.
Warranty :
-1 years manufacture warranty:
We will offer your free new parts or accessories with free shipping during 3 months after your purchase.
We will offer your free new parts or accessories but you need to pay for some shipping fee if more than 3 months less than 1 year .
-Defective problem has to be submitted within 7 business days after product is delivered;
-Shipping damage has to be submitted within 5 business days after product is delivered.
-Please show us photo or video if happens problems on products.
Contact Us:
-If you want to place a large order for wholesale, please feel free to contact us.
-If you need to order multiple items, pleases let us know first. We can offer you some discount.
Feedback:
-All products are 100% original new and tested again before shipment. Customers' satisfactory is our goal.
-Any feedback from you will be much appreciated. If you're satisfied with our service or products, please give us 5 stars.
-If you have any questions, please contact with us, and we will get back to you sooner.
Please Note:
-What if you are dissatisfied with the products, or the products has any quality problems, please contact me at any time, we will solve your problem, unnecessary to submit a dispute.